WOJUN

dot

Metal fence

Metal fence

Column Cross tube Vertical pole Remark
50mm*50mm wide square tube
80mm*80mm wide square tube

The above are conventional data and can be customized according to customer requirements.

40mm*40mm wide square tube
50mm*50mm wide square tube The above are conventional data and can be customized according to customer requirements.
Conventional square tubes are 19 mm * 19 mm and 25 mm * 25 mm in width. There are two ways to handle the tip: one-piece molding and splicing assembly.             The surface treatment method of metal pipes is to use special spraying equipment to evenly spray paint on the surface of the metal pipe to form a protective layer to prevent corrosion and oxidation. Commonly used coatings include epoxy resin, polyester powder, etc.
Height:
1 meter(39inch) high
1.2 meters (47inch)high
1.5 meters (59inch)high
1.8 meters(70.8inch) high
2 meters (78.7inch)high
Width:
3 meters (9.8FT)wide in column The above are conventional data and can be customized according to customer requirements.
  The appropriate number of horizontal tubes (two rows or four rows) can be selected according to customer needs or uses.   The conventional vertical pole spacing is about 120 mm, which can be customized and encrypted according to customer requirements, and decorative accessories can be installed.

Detailed diagram of zinc steel fence:
Detailed diagram of zinc steel fenceDetailed diagram of zinc steel fence

Zinc steel fence assembly diagram:

Detailed diagram of zinc steel fenceDetailed diagram of zinc steel fence

Zinc steel fence can be customized according to drawings:

Detailed diagram of zinc steel fenceDetailed diagram of zinc steel fence

We can also customize a lot, if you have the drawings we can produce them.
Zinc steel fence usage diagram:

Zinc steel fenceZinc steel fence

Installation steps of zinc steel fenc:
First, you need to prepare all the fence materials, including posts, beams, fence panels, etc.
According to the pre-designed fence layout, mark and measure on the ground, and dig foundation holes with a depth of 30-50 cm where the posts need to be fixed.
Insert the columns into the foundation holes and adjust them with a horizontal instrument to ensure that each column is vertical and level.
Bolt or weld the columns and beams together. If you use bolts to connect, you need to thread the nuts and washers first, then pass the bolts through the columns and beams, and tighten the nuts with a wrench.
Install fence panels on the beams and connect the fence panels and beams with bolts or welds.
Check whether all parts are tightened or welded firmly to ensure that the fence is installed firmly and reliably.
Finally, clean up to remove all garbage and construction traces to ensure that the environment around the fence is clean and beautiful.

Metal fenceMetal fenceMetal fenceMetal fence


Last:Chain link fence
Next:Mobile fence

need any help

PROVIDE PRODUCT QUOTATIONS AT ANY TIME